At present, we're working through the revised report which has been shared by the employer with staff to see what (if anything) has changed following the first phase of 'informal consultation. As members carrying out valuable work in clerical and admin roles, we'd welcome your comments and observations on not only the Council's responses to us but on any new issues that have arisen that can be addressed during this second, 'formal', consultation period.
You an do this by making a comment on this post at the foot of the page, by emailing the Branch Office at office@unison-angus.org.uk or if you're a member of the UNISON Angus Facebook page, by commenting there. Any confidential issues should be emailed to us rather than posted.
Subject
|
Comments
|
Review Group response
|
1. Grading
|
We note that the grades of the new posts are
marked ‘to be agreed’ and the Report advises that grades are ‘indicative’.
When will the formal grading for these posts be carried out?
|
This will
be completed prior to the formal consultation commencing.
|
2. Savings
|
If the required savings have been made and there
are sufficient posts for all in scope, why does the report say that
applications for ER/VR are being considered?
|
The
Council has a £40 million funding gaps so it is inevitable that further
savings will need to be identified as we streamline and digitise our
processes.
Requests
for ER/VR are not only looking at the clerical and admin review but also the
wider business support area and the Council’s aspirations as stated in its
Corporate Plan to be a smaller and digital Council by 2020.
|
3. Tables on page 8
|
Can you check and clarify the calculations and
figures contained in the tables on page 8 as they do not tally.
|
These
have been checked and are correct – if you wish further clarification please
let us know.
|
4. Training and Training Needs Analysis
|
a). We would suggest that a Training Needs
Analysis for staff will need to be carried out due to the wide range of roles
and responsibilities that are encompassed by the posts in scope;
b). What plans are in place for the expected
training implications of staff potentially moving into new areas of work?
|
Noted
This will be the responsibility of the new
Manager – Business Support.
|
5. Transferability of Staff between People and Place
|
We assume that staff will be matched into posts
in either People or Place?
|
There is
only one Business Support team supporting both directorates – staff will be
matched in according to the Council’s managing workforce change
policies; in particular “Filling Jobs in a new organisation structure –
Matching & Recruitment” which sets out in detail the process which will
be followed.
|
6. Selection Processes
|
What selection process will be followed when
equally qualified staff are matched but one or more needs to move to a post
in People or Place whilst others stay in their existing Directorate?
|
We would refer you to
the Council’s managing workforce change policies; in particular “Filling Jobs
in a new organisation structure – Matching & Recruitment” which sets out
in detail the process which will be followed.
|
7. Posts in E & M Support
|
Two LG3/LG4 posts have been identified to be
transferred to E & M Support? How will the posts be selected and
filled?
|
We would refer you to
the Council’s managing workforce change policies; in particular “Filling Jobs
in a new organisation structure – Matching & Recruitment” which sets out
in detail the process which will be followed.
|
8. Lack of Information & Clarity
|
a). It was felt by our many of our members that
the briefings were, from their perspective, vague and lacking clarity.
Members alluded to the proposed structure, but other than that they were of
the view that they didn’t have any information on where (either individually
or collectively) where were to ‘fit’ into the revised organisational
structure. Assurances are sought that during the formal consultation phase,
more clarity is provided for our members on where they are o that they are
able to provide constructive feedback to the review team;
b). Members are assuming (or just don’t know)
that their post is to be transferred into the IT or P2P teams. For all
members involved in this potential transfer, clarity and confirmation is
sought at the earliest opportunity of the final number of proposed posts and
who is being considered.
|
The
structure shows that there will be one new Business Support Team which will
be based in HR & Business Support.
Whilst posts will be
contained within the new business support team. Initially, these posts will
be performing the same duties as before but they will be managed by the new
Manager – Business Support.
Implementation
will be on an incremental basis to ensure maintenance of service delivery.
There will be further communication regarding the implementation plan once
formal approval is given to the new structure which cannot happen until after
the formal consultation process has been completed.
Staff
will advised during the formal matching process which will commence after the
formal consultation process has been completed and the new structure formally
approved.
|
9. Specialisms
|
a). Members have made many comments on the
removal of specialisms. This despite previous assurances that many Business
Support staff do carry out specialised tasks and that this would be reflected
in the new structure.
b). What was the justification or process which
concluded IT admin and clerical staff were specialist whereas RPS, CARO or
licensing weren’t?
|
The purpose of this review was to bring together
the management of business support under one manager. One of the reasons for
this is to ensure that we as a council have no “single points of failure” in
terms of service delivery but instead have a team of people who are able to
deliver a broad range of services. The Business Support team will be required
to deliver on the agreed service delivery requirements of each of the
services which they support to ensure that there is no failure in service
delivery. There will be a managed transition from specialist functions in
line with the aspirations to be a smaller digital council
IT staff
were taken out of scope due to the technical nature of their posts and they
be subject to a separate review.
|
10. ER/VR
|
a). When
will staff be advised of the outcomes of their applications for ER/VR?
b). If a
member who has asked to be considered for VR/ER has applied to go to
University in the late summer, would their application for ER/VR be
considered favourably and ahead of other staff without such plans?
|
Any
confirmed applications will be reviewed as part of the matching process and
employees will be updated during this process.
Anyone
who is over 60 can choose to leave under the Council’s Early Retirement
Scheme at any time.
As above
|
11. Existing flexible working arrangements
|
Members are concerned that given the broad scope
and sheer size of the review, existing flexible working arrangements may not
be honoured upon implementation of the final Review proposals. What
assurances can be offered to members in this regard?
|
It is not anticipated that there will be any
changes to existing flexible working arrangements.
|
12. Mobility
|
In both the Level 1 and Level 2 Business Support
roles, ‘mobility’ is defined as an essential criteria. What is your Review’s
definition of ‘mobility’? For members who don’t drive or have access to a car
does this mean they will not have all the necessary criteria for one of the
posts? And if that’s the case, what will happen to them?
|
There is no requirement for any member of staff
to have a car.
This is to reflect the agile working policies
which the council has in place.
|
13. Staff in scope and available posts
|
a). Members are seeking clarity with regard to
staff in scope – of those in scope, how many are on temporary contracts?
b). It was stated that there are sufficient
‘jobs’ for everyone in scope. Are all these jobs permanent?
c). If so, is there a possibility that temporary
staff in post will be matched to permanent positions?
|
Permanent employees and temporary staff with more
than 2 years of employment will be considered for posts initially.
All posts in the new structure are being
established on a permanent basis initially.
|
14.Appeal Process – Review Placing
|
Members included in the Review may potentially be
included in the P2P or IT Structure and in turn become part of another
Review. If members are of the view that they have been placed in the ‘wrong’
team, are they able to formally appeal this decision?
|
There is no formal appeals process for this
situation but we would encourage your members to contact a member of the
implementation team should this arise.
|
15. Reporting Lines
|
The proposed structure shows both the Business
Support Officer posts and Business Support Assistants reporting to the
Business Support Supervisor for both directorate structures. With the numbers of staff involved this
volume of direct reporting seems excessive and cumbersome. How will this be
managed practically?
|
The new
structure reflects the council organisational design principles and operating
model for 2020. Management responsibilities for the business support posts
will be split between the 4 Business Support Supervisors which falls within
the agreed span of control ratios.
|
16. Business Support Supervisor Person Specification
|
The
Business Support Supervisor proposed job outline / person specification
states that ‘the
specific nature of the duties to be undertaken by each job holder will be
determined by the employing directorate. This
could result in different working practice in operation in the directorates;
given the desire for generic roles and job descriptions, how will this
potential situation be managed strategically?
|
This is an error and will be corrected prior to
the formal consultation.
|
17. P2P Team
|
Is
Is this team a project team with a route back to business support or is
there a vision this team would be integrated in to the finance team after
delivery of the anticipated £200K savings?
The report isn’t clear and doesn’t state the posts would be subject to
further review or evaluation on transfer.
|
This
review has not yet commenced and the aims and objectives agreed, so it is too
early to comment on any potential outcomes.
|
18. IT Systems Support & Development Team
|
a). The creation of the new team has not been
widely communicated in the organisation, can more information be provided to
staff affected?
b). Was a delay in the review of the performance
information team review considered for staff proposed to be transferred? This would have allowed for all affected
staff to be consulted at the same time and allow all staff to participate in
discussions e.g. new job profiles and job evaluation to manage this proposed
workforce change including the fact structural arrangements needed to be put
in place.
c). A Senior Systems Officer is currently being
recruited on a temporary basis until no later than 30 June 2019. Is this
position going to be ringfenced for those already identified as being in the
Support & Development Team?
|
This was subject to a separate review and we will
pass these comments onto the Service Lead IT & Digital Enablement.
The Review team were not sighted on this project
and therefore cannot comment.
The Review team were not sighted on this project
and therefore cannot comment.
|
19. Job Evaluation Scheme / Process
|
Members would like more transparency and clarity
on this or confirmation this can be found. This is particularly relevant as
the process is referred to in the Consultation Report.
|
Members
of staff should contact HR for more information.
|
20. Pay and Grading Review
|
Given the reference to this forthcoming Review,
are there any potential timescales set for this?
|
This is
not within the remit of this project and therefore we cannot comment on this.
|
21. Business support manager post & Team Leader – Payroll/
Staffing
|
Is there a timescale for recruitment for this
post? Given the Business support
structure out with the single LG12 Team Leader Post (with no indication of
levels below) and with no indication of the Accessline Supervisor pay scale
the difference from LG14 to LG8 seems considerable. There was no provision of the job outline
for the team leader post as part of the consultation document – given this is
a new job it would have been helpful.
|
The
manager post is due to be advertised within the next two weeks.
The LG12
post was created as a result of the Management Review and was initially
designated as Team Leader – Payroll and Staffing – this has now been widened
to include Business Support – at the time of publication of informal
consultation the updated job outline was not available. However, once
published this will be for information only as it was agreed as part of the
management review.
|
22. Career Development Pathway and Competency
|
How will competencies be addressed for clerical
and admin staff who have no knowledge of a service and need to gain an
understanding of the business they are to support before they can undertake
duties? To be competent in all the elements required for a clerical post
could take several months. Therefore,
there should be an acknowledgement that either training or a specific element
to induction will be needed before a person can comfortably fulfil a role
either from an LG3 entry point or at various stages during their career
progression.
|
Section
3.5 of the report provides initial
details on how this will be progressed. There is no further information
available at this time.
|
23. “Do it once, do it well”
|
Our member has noted that managers in all
business areas will need to contribute as well as be able to access
information directly. Often deviation
from the generic principles is at the request of managers and the potential
for this needs to be managed.
|
We note your comments.
|
24. Further efficiency reviews and savings
|
Members sought clarity on who would be leading
the further reviews referred to as the current project lead has been
appointed under the management review to a post and that the majority of the current project team are
affected directly by the outcomes of this Review.
|
Project
Leads are currently being identified as part of the wider change programme.
|
25. Confirmation of current Vacant posts in scope
|
Given the scenario that vacant posts are to
provide a significant amount of the savings from the Review, could the
current position on vacant posts be reflected to provide transparency and understanding
to members of the consequences of the Business Support Review e.g. where
breakdown of posts is detailed including the areas identified as no longer
being in scope?
|
Heads of
Service have agreed the position in relation to vacant posts within their
service areas.
|
26. Wider consistency and the original review specification
|
a). Is it possible to demonstrate that a
consistent approach across the staff based reviews is being applied,
particularly after the removal of 104.88 FTE posts;
b). Given 104.88 FTE are no longer in scope for
the review, why was the initial scope so wide given the revisions now
made? The stress of inclusion could
have been minimised particularly given the delays in meeting the original
timescales.
|
Information
across the organisation was not available at the initiation of the project.
Scope of project was agreed by senior managers in the organisation.
Information from the change programme and from the survey data was used to
determine if scope was to be revised.
We note your
comments re timescales and would ask you to note that responses to all
surveys were not received from employees in scope until the end of January
(closing date 22 November) which meant that data could not be fully analysed
within the previously agreed timescales impacting on the overall timescales
of the project.
|
27. Organisational Design Review
|
This was alluded to briefly in the staff briefing
sessions but more information would be helpful so that staff can understand
why it’s being done and what it entails.
|
This is
outwith the scope of this review and therefore we cannot comment on this.
|
28. Customer Service model
|
Given all the changes and potential impact for
both internal and external customers is there a mechanism going to be put in
place to manage standards and ensure a consistent approach to operational
practice is achieved?
|
A
protocol for engaging with the new Business Support team will be drafted by
the Manager- Business Support once in post. This will detail how allocation
of work and support will be provided.
|
29. LG6/LG7 split
|
For information, members have enquired as to how
the current LG6 and LG7 posts divide into People and Place roles?
|
There are currently 19.2 FTE in Place and there
are 12.6 FTE in People.
|